Every operator on the current procedure, and the record to show your auditor.

For plants certified to ISO 9001, IATF 16949 or AS9100, and inspected by OSHA. Procedures approved and controlled, sent to the lines and shifts they cover, and on record by person and by version.

30-day trialUnlimited free viewersNo credit card required

Inside a steel plant: overhead cranes, a large lifting hook, walkways and steel frames lit in amber.

Ready for the certification audit

A well-run quality system already has the procedures. The work is keeping every line on the current version, and the proof in one place.

ISO 9001, clauses 7.5, 5.2, 7.3

ISO 9001 documented information

Approved, current procedures at the point of use, with superseded versions out of circulation, and a quality policy every operator has seen.

  • Each procedure approved, versioned and reviewed on schedule
  • Only the current version reaches the floor
  • Every operator’s acknowledgment, by version

IATF 16949

IATF 16949 documented processes

Product safety, contingency plans and change control each call for a documented process, and every change has to reach the people it affects.

  • Documented processes held as approved versions
  • Each change approved, then sent to the affected lines
  • History of every revision for the auditor

AS9100

AS9100 procedures and awareness

Counterfeit-part prevention, configuration management and product safety procedures, with staff aware of their part in each.

  • Procedures sent to the roles they cover
  • Awareness recorded by person and version
  • Review dates on every procedure

29 CFR 1910

OSHA written programs

Hazard communication, lockout/tagout and emergency action each have a written program. Keeping them current at every plant is the steady work.

  • One program per site, sent only to that site
  • Technicians told every time a procedure changes
  • Training records attached as evidence

How it helps a plant

Built for quality and EHS teams who show document control to registrars, customers and inspectors, across every line and shift.

The right procedure at the point of use

Operators see the current version only. Superseded ones stay in history, out of circulation.

New hires covered from day one

Invite an operator with their line tag and their procedures are waiting.

No seat cost for the floor

Operators and other viewers are unlimited and free. You pay for the people who write.

Every change goes out again

A revised procedure is approved, then everyone it covers is asked again, automatically.

Reviews on schedule

Review dates remind each procedure’s owner ahead of time.

Proof on request

Filter the record by date, person or procedure and export a PDF or CSV.

Each line gets its own procedures

Tag people by plant, line and role. Each procedure reaches only the people it covers, and new hires get theirs on day one.

A record for every operator

Show the auditor who has acknowledged which version, with the time and the statement they agreed to.

The rest of the binder

Certification covers part of it. A plant runs on many other policies, and they need the same control.

Work instructions

Line-side instructions approved like procedures, so a changeover never runs on last month’s sheet.

Supplier quality manual

Sent to suppliers as external users, with their acknowledgment on record.

Calibration and gauge control

The procedure versioned, with calibration certificates attached as evidence.

Harassment prevention

Plants in California and New York carry state policy and training duties for every shift.

Handbook and code of conduct

One current version for operators, engineers and office staff, confirmed when it changes.

Information security

Customer drawings and specifications are covered by an acceptable use and confidentiality policy.

Ready for whoever asks.

Registrars, customers and OSHA ask the same thing in different words: the current procedure, who approved it and who has it.

Export the record as a PDF or CSV, or let an auditor open the document directly.

  • RegistrarControlled documented information, with approvals and review history
  • Automotive and aerospace customersDocumented processes and proof each change reached the line
  • OSHAWritten programs that are current, with proof each worker received them
  • Your insurerSafety programs approved and current, with proof of who received them

Built around your plant

Plants and linesTags such as Dayton, Line 3 or Maintenance send each procedure only to the people it covers.
SuppliersInvite suppliers as external users to receive and acknowledge your supplier manual.
ConsultantsBring in your quality consultant as an external user to write and review.
AuditorsGive a registrar or customer auditor one document with a one-time code.

Need help writing the policies? Find a consultant for your standard.

Questions

Do operators need a paid seat?

No. They read, acknowledge and sign as viewers, free of charge.

Acknowledgment or signature?

Both are available. Choose for each policy when you send it. e-sign is an add-on on the Scale plan.

What happens when a policy changes?

The new version is approved, then sent to everyone it applies to, who are asked again.

Can an auditor see a document without an account?

Yes. Add them as a one-time viewer and they open that document with a one-time code.

We run several plants. Can each get its own procedures?

Yes. Tag people by plant, line and role, and each procedure reaches only the people it covers.

What happens to someone’s record when they leave?

Their completed acknowledgments stay on record.

Try AllyMatter free for 30 days

  • No credit card needed
  • 30-day money-back guarantee
  • Free migration on yearly plans